Our projects

Swedish Tissue

The Sofidel Group’s need was to uniformly and safely heat the Swedish Tissue facility in Sweden, considering that the type of processing conducted inside is considered to have a high fire risk.

LEAN MORE

Biko Meccanica

The company needed to replace the heating system in the existing warehouse, which consisted of a system with hot water air heaters, and also needed to provide heating for the new adjacent industrial warehouse.

LEAN MORE

Alstom

For the Montoir de Bretagne production facility, the company needed a new efficient heating system that could quickly warm the entire facility.

LEAN MORE

Castellini srl

The customer’s requirement was to uniformly heat the new production site, while paying particular attention to architectural and aesthetic constraints, as well as the height of the facility, which ranges from 16 to 23 meters.

LEAN MORE

Produtech

The company’s goal was to create comfortable working areas for its employees throughout the year using systems that were effective and sustainable in terms of energy savings.

LEAN MORE

Franco Tosi Meccanica

The need of the customer was a heating system that could be flexible and that could quickly reach full operation considering the large surface to be heated.

LEAN MORE

C.M.S Meccanica

C.M.S.’s goal was to effectively cool the 1400 m2 production area to create a comfortable environment for its employees while ensuring precision and quality in the work processes.

LEAN MORE

Krasnodar Stadium

The goal was to achieve uniform heating of the stands, in order to allow spectators to attend matches of their favorite team in a comfortable environment under any weather condition.

LEAN MORE

Hyundai Říčany

The customer’s objective was to use a 100 kW condensing boiler to supply water to the radiant panel circuits and our radiant heating system. This would ensure uniform and efficient heating for the new showroom.

LEAN MORE

Forno Da Re

Forno Da Re needed to cool its production departments, which became excessively hot during the summer months. The high temperatures led the staff to frequently interrupt their work to take breaks in order to avoid heat-related health issues.

LEAN MORE

Fiat CNH

The goal was to upgrade the heating system. The existing one was inefficient and consumed a lot of energy. The continuous convective movement of air raised dust, making breathing harmful, and the control over performance and costs was approximate.

LEAN MORE